Full Gut

This renovation took about six months to complete and was a full gut and re build project. We used in floor heating throughout the entire home, re did all electrical and plumbing, rebuilt all interior walls and sprayed insulated the entire house. We Removed interior structural walls to provide an open concept flow on the first floor and to accommodate a new kitchen. We built a large dormer on the 2nd floor to allow for more head space in both the bathroom and guest room. We also replaced all windows and custom framed the front door. The List continues as we fully renovated this home from top to bottom and from inside to outside.

Full gut - Before Single Page Full gut - After Single Page